NAICS 238210 · FEDERAL PROCUREMENT
Electrical Installation federal bids and tenders
Browse U.S. federal tenders, bids and contract notices classified under NAICS 238210 (Electrical Contractors and Other Wiring Installation Contractors). Use the classification to focus discovery, then review the complete solicitation scope and official source before deciding whether the work fits your business.
Opportunity feed updated 2026-11-09 12:17 UTC.
Alerts start after you save your filters, choose delivery and confirm your email. Date-only deadlines may close earlier today; check the exact time and amendments on the official source.
CURRENT NAICS 238210 NOTICES
Recently posted opportunities
Showing up to 12 matching notices with response dates today or later, classified under NAICS 238210.
129 CS - Telecomm Conduit Install
DEPT OF DEFENSE · PANNGB-27-P-0000042962
J061--ELECTRICAL TESTING (SOLICITATION)
VETERANS AFFAIRS, DEPARTMENT OF · 36C24627Q0081
106 CE ELECTRICAL LOOP REPAIR
DEPT OF DEFENSE · W50S8E27QA001
J059--Tri-Annual PM & Testing of Switch Gears - Base Year
VETERANS AFFAIRS, DEPARTMENT OF · 36C26227Q0112
J059--FY27 Electrical Test and Calibrations
VETERANS AFFAIRS, DEPARTMENT OF · 36C24227Q0133
657A5-26-111, Triennial Electrical Testing
VETERANS AFFAIRS, DEPARTMENT OF · 36C25526R0186
7A21--460-24-009 CLC and Fourth Floor Patient Elopement System
VETERANS AFFAIRS, DEPARTMENT OF · 36C24427R0001
J061--Triennial Circuit Breaker and Feeder Testing
VETERANS AFFAIRS, DEPARTMENT OF · 36C26127Q0067
Z1DA--Project No. 583-22-106- Replace Electrical Panels & Expand Distribution.
VETERANS AFFAIRS, DEPARTMENT OF · 36C25027B0002_1
ESG SVTC Upgrades
DEPT OF DEFENSE · 2027-PZI-1818
Inspect and Repair of 13.2KV Main Switchgear
HOMELAND SECURITY, DEPARTMENT OF · 70ZH1526QCGA00009
Repair gates and limit switches to feedmill in Miles City, MT
AGRICULTURE, DEPARTMENT OF · 124PSA27Q0018
How to screen electrical installation opportunities
Assess federal electrical and wiring projects by equipment, installation scope and site conditions. A power upgrade, controls installation and new building fit-out require different crews, materials and shutdown arrangements.
- Distinguish equipment supply from installation, testing and commissioning.
- Check drawings, circuit schedules, equipment ratings and compatibility with existing systems.
- Confirm site access, outage windows and the qualifications specified in the notice.
- Review inspection, handover, warranty and service responsibilities.
Use the buyer-assigned classification for discovery, then verify the complete scope, eligibility and current amendments in the official notice. Related requirements may be advertised under other classifications.
Build your estimate before you bid
- Separate equipment, cabling, containment, installation labour and commissioning in the estimate.
- Allow for access equipment, outage coordination, temporary services and reinstatement where required.
Does an electrical notice cover low-voltage systems?
Read the scope and drawings. Communications, controls and other wiring work may be included, but the classification alone does not establish the system, voltage or qualification requirements.
Use the bid / no-bid checklist · Plan your response milestones
Electrical contract example: plan the outage as well as the installation
GovBidFit planning example · Illustrative assumptions, not a live solicitation or market price.
Suppose a hypothetical project replaces two distribution panels in an occupied building. A materials list for two panels is only one part of the scope. Removal, temporary arrangements, shutdown coordination, testing and reinstatement can determine whether the proposed delivery plan is feasible.
- Trace each panel in the drawings and schedules. List connected loads, interfaces and any dimensions or ratings that must be verified rather than assuming the replacement is interchangeable.
- Build a sequence covering access, isolation arrangements, removal, installation, testing and return to service. Use the approved working windows and the responsibilities specified by the buyer.
- Link every required inspection, test record, label, drawing update and handover document to a response or delivery task. Check supplier lead times against the stated completion date.
Ask about missing drawings, conflicting equipment schedules and outage permissions through the solicitation's communication process. Have appropriately qualified personnel determine the technical method and safety arrangements. This planning example does not provide installation instructions or establish equipment suitability.
What can make two electrical replacement bids difficult to compare?
One response may assume uninterrupted access while another includes phased shutdowns, temporary services and after-hours work. Reconcile both with the same official scope and assumptions before comparing the proposed workload.
Finding Electrical Installation tenders in the USA
Start with NAICS 238210. For broader discovery, try service terms such as electrical installation, wiring, power distribution. Compare notice type, location and deadline before narrowing by set-aside. The buyer’s assigned code and official documents control this opportunity.
Get free electrical installation email alerts →
Related contract areas
Verify the source: SAM.gov Contract Opportunities. Check the official classification in the Census Bureau NAICS reference.
Using NAICS 238210 to find federal contracts
Use this classification as a starting point for opportunity discovery. Compare the statement of work, place of performance, PSC, set-aside status and response deadline before investing in a bid. The official solicitation and amendments remain controlling.