GovBidFit database · SAM.gov sourceData refreshed November 15, 2026Official description stored

Sources Sought

417 SCMS Landing Gear Depot Support (LGDS)

Solicitation SPRHA1-27-R-LGDS · Due 2027-01-11. 417 SCMS Landing Gear Depot Support (LGDS). DEPT OF DEFENSE in Utah · NAICS 336413.

SolicitationSPRHA1-27-R-LGDS
Notice typeSources Sought
PostedNovember 10, 2026
Response deadlineJanuary 11, 2027
Place of performanceUtah
ClassificationNAICS 336413 · Other Aircraft Parts and Auxiliary Equipment Manufacturing · PSC 1620
Set-asideNo Set aside used

OFFICIAL NOTICE CONTENT

Opportunity description

Stored from SAM.gov public data

417th SCMS Landing Gear Depot Support (LGDS) Request for Information This announcement constitutes an official Request for Information (RFI). This is not a Request for Proposal (RFP) or an Invitation for Bid (IFB), nor is it to be construed as a commitment by the government. The Government will not pay for any information provided in response to this RFI. Scope The 417th Landing Gear Supply Chain Management Squadron (417 SCMS), Enterprise Hill Commodity Council (EHCC) and Defense Logistics Agency (DLA) are developing a strategy to support Ogden Air Logistics Complex (OO-ALC) Depot production goals associated with the B-52, C-5, C-130, KC-135, and E-3 platforms. This strategy will subsume the workload currently supported under the Landing Gear Performance Based Logistics (LG-PBL1) contract, while expanding support to the B-52 and C-5 platforms. The primary goals of this future contract are to provide: 1.) Complete Component Parts Kits: Support Depot remanufacture of landing gear Depot Level Reparables (DLRs) for all five weapon systems, 2.) Remanufacture Support: Fulfill remanufacturing requirements based on the delta between supply chain need and depot production capability. 3.) Process Offload: Relieve operational bottlenecks and single-point process failures (e.g. plating, grinding) at the organic depot. Background The 417 SCMS currently supports the LGDS requirements through multiple vehicles: LG-PBL1 Contract: Single-award, Firm-Fixed-Price (FFP) award-term contract (consisting of a 5-year base and two 5-year award terms), supporting the C-130, E-3, and KC-135, expiring in 2032. The prime contractor is responsible for the quality and delivery of all parts. This contract operates under a Public-Private Partnership (PPP), incorporating a direct sales approach with incentives/disincentives tied to outcome-based performance metrics. Remanufacture percentages are roughly 60% organic Depot, and 40% contractor facility. Organic Depot Support: The B-52 and C-5 are remanufactured 100% organically at the OO-ALC depot, with individual component parts (kit parts) purchased transactionally through DLA. Developing Strategy The USAF owns the preponderance of the technical data and maintains a Boeing Rights Guard agreement for limited data on the E-3 and KC-135 landing gear systems. The Government has determined that to be successful this contract strategy must: Allow the contractor to leverage the Government�s buying power for consumable parts, while streamlining and improving the purchase process. Provide a single contractor with management responsibility for the entire population of replacement parts supporting DLRs. Improve forecasting and inventory accuracy Provide relief for single-point process bottlenecks (e.g., plating, grinding) within the organic depot Provide remanufacture support for all DLRs beyond the throughput capacity of Government depot, to be fulfilled at the prime contractor�s facility. Incorporate properly balanced incentives and disincentives for contractor performance Due to the nature of this effort, the complexity and magnitude of the transition process, and the need for a single point of accountability, the Government intends to award a 15-year IDIQ-type contract. The single-award long-term approach will allow the contractor ample time to conduct the necessary research for proper phase-in of consumable kits, and support the transition of current LG-PBL1 workload. The Government intends to develop an outcome-based support contract utilizing a workshare payment approach. The primary objectives of this contract are to: (1) Improve landing gear piece part and assembly supportability (2) Provide remanufacture support beyond organic capacity 4.0 Performance Expectations Performance requirements under the future contract will include: Asset Availability of consumable kits to support OO-ALC Depot production lines Core remanufacture support for E-3, KC-135, and C-130. Potential expanded remanufacture support for B-52 and/or C-5. Industrial process (e.g. plating, grinding,) offload at the contractor�s facility when organic depot bottlenecking occurs. The LGDS acquisition team is asking for feedback from Industry representatives regarding this strategic support acquisition for Landing Gear spare parts. 5.0 Industry Feedback Questions: Please provide the following business information for your company:: Company Name Address Point of Contact CAGE Code Phone Number E-mail Address Web Page URL Size of Business under NAICS Code 336413 (Small Business Size Standard is 1,250 employees) The Government is anticipating a 15-year Firm-Fixed-Price contract for this effort. Describe any commercial risks, pricing volatility, or supply chain issues your company foresees with a 15-year duration. What Economic Price Adjustment (EPA) indices (e.g., specific Bureau of Labor Statistics PPI codes) or adjustment mechanisms would you recommend to mitigate long-term pricing risk? Describe your company's capability to procure all parts listed in Attachment 1 (Consumable Kits). What predictive tools, supply chain modeling, or consumption tracking methods do you use to anticipate demand and mitigate long-lead consumable shortages (e.g., specialized fasteners, seals, forgings)? What experience do you have supporting variable/operationally dependent Air Force parts needs, including surge requirements? Describe your company�s in-house capability and annual capacity to remanufacture the parts listed in Attachment 2 (LG-PBL1 NIINs). Does your company have experience providing parts and production support for complex landing gear assemblies throughout the remanufacture process? Please describe your company�s experience with USAF/Landing Gear engineering protocols, Engineering Change Proposals (ECPs), and Quality Management. Describe your company�s experience managing legacy USAF weapon system component obsolescence and resolving recurring non-conforming parts issues within a remanufacturing environment. Does your company have the capability and experience to train, qualify, and certify personnel to perform critical military-grade remanufacturing processes? Describe your experience providing transition support from an expiring government contract to a new government contract. Describe your experience integrating with and using Government software systems. 6.0 Submission Instructions The Government is accepting responses to this request for information via email only. Please provide written responses to the Contracting Officers and Program Manager by 11 January 2027 at the following email addresses: Nathan Flinders Contracting Officer Nathan.flinders@dla.mil Justin Rogers Contracting Officer Justin.rogers.28@us.af.mil Trevor Russell Program Manager Trevor.Russell.2@us.af.mil Attachments: Consumable Kits List by WS Current LG-PBL1 NIINs

FEDERAL BUYER

Buyer and contracting office

View buyer page →
Department / agencyDEPT OF DEFENSE
Sub-tierDEFENSE LOGISTICS AGENCY
Contracting officeDLA AVIATION AT OGDEN, UT
Office addressHILL AIR FORCE BASE, UT, 84056-5820, USA

Public points of contact

PrimaryNathan Flindersnathan.flinders@dla.mil
SecondaryJustin Rogersjustin.rogers.28@us.af.mil

DOCUMENTS & LINKS

Opportunity documents

Verify on official source
Attachment URLs are not included in the SAM.gov bulk record for this notice.

That does not mean there are no documents. Open the current SAM.gov notice to see the authoritative attachment and amendment list.

View documents on SAM.gov ↗

GovBidFit does not invent or cache guessed attachment links. The official SAM.gov notice remains the controlling document source.

NOTICE TIMELINE

GovBidFit change history

1 stored event

This timeline records when GovBidFit first stored the notice and material field changes detected during scheduled SAM.gov refreshes. It is an audit aid, not a substitute for the official amendment history.

First seen by GovBidFitNovember 11, 2026

GovBidFit first stored this opportunity from the SAM.gov public bulk feed. This does not replace the official posting date shown above.

GOVBIDFIT SCREENING LENS

What deserves attention before you spend bid time

Decision support

These screening signals are generated from the public notice fields stored for this specific opportunity. They are not eligibility findings or predictions; they are prompts for a faster, more disciplined review of the official solicitation.

Market-research stage

This notice appears to be market research rather than a conventional bid invitation. A capability response, technical feedback or evidence of market interest may matter more than a price proposal at this stage.

Planning window available

The stored response date leaves more than ten days, but amendments and pre-response milestones can shorten the usable preparation window.

Eligibility gate recorded

No Set aside used is recorded as the set-aside or restriction. Confirm the bidding entity actually satisfies the applicable program and size requirements before investing proposal time.

Classification signal

NAICS 336413 · PSC 1620 is the recorded classification. Use it as a screening clue, then compare the actual scope and deliverables rather than treating the code alone as proof of fit.

Official description stored

GovBidFit stores the source notice text, but its length does not prove the requirements are complete. Review official attachments, clauses, amendments and Q&A before relying on the description.

Public buyer contact available

The source data includes 2 public contracting contacts. Use the solicitation's stated communication rules and deadlines before contacting the buyer.

Questions to resolve next

Has SAM.gov posted an amendment or changed the response date, attachments or submission instructions since this GovBidFit snapshot was refreshed?Does the notice request a capability statement, technical response, questions, pricing input, or another specific market-research response?Are there question deadlines, site visits, registrations or internal approvals that occur before the final response date?Does the bidding entity hold the required current status for the recorded set-aside and the solicitation's assigned NAICS size standard?Can the business perform in Utah at a sustainable cost after travel, mobilization, staffing, licensing and subcontractor requirements are considered?

What this opportunity record tells you

SAM.gov identifies this as a sources sought from DEPT OF DEFENSE. The record was posted on November 10, 2026 and currently lists January 11, 2027 as the response deadline. GovBidFit keeps source facts separate from its matching guidance so you can see what comes from the federal notice.

The listed product or service classification is NAICS 336413 · Other Aircraft Parts and Auxiliary Equipment Manufacturing · PSC 1620. The set-aside field is No Set aside used. These fields help narrow your search, but they do not replace the full solicitation, amendments, attachments, clauses or eligibility language on the official source.

Before deciding to bid

Read the complete official description and scope. Verify the exact response date, time and time zone on SAM.gov. Confirm NAICS/PSC and every set-aside eligibility requirement. Review attachments, amendments, Q&A and submission instructions. Check place of performance, staffing, insurance, bonding and execution requirements.
Source and trust

GovBidFit lets you browse federal contract opportunities for free and create free bid alerts. It displays public SAM.gov notice data stored in its database, with a compact snapshot as a fallback. GovBidFit is independent and is not a U.S. government website. Data can lag amendments or later source changes, so always verify the current notice, attachments and deadline on SAM.gov before bidding.

Open the official SAM.gov notice →