OFFICIAL NOTICE CONTENT
Opportunity description
CONTACT INFORMATION|4|N762.43|P2R|771-229-0536 |Andrew.n.phillips10.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|X||||||||||||X|||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT COMBO TYPE ||TBD|N00383|TBD|TBD|See Schedule|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months|60 days after discovery of defect||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERSDELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 1.3 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWCADLKE; drawing number ( ;PROJECT 50031 L1 REV F.3 GENATOM-0001; ) ;47VD1; , Revision ;REV F.3; and all details and specifications referenced therein. 1.4 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.5 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE 4.1 . Mandatory Inspection Requirements: 100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR). During production, mandatory inspection is required to be accomplished by the contractor as follows: A. Level of Inspection (LOI). 1. Critical characteristics: 100% inspection shall apply. 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR. B. Critical characteristics: ;Load test requirements per direction of NAWCADLKE.; C. Major and Minor characteristics 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE FIRST TIME BUY TDR NO 23-10039 COMPLETED BY NAWCADLKE ON 7/13/2023. IN SUPPORT OF THIS SOLICITATION/CONTRACT FOR THIS ALRE ITEM, TDR NO. 23-10039 WAS USED. PER TDR 23-10039 LOAD TEST REQUIREMENTS SET BY NAWCADLKE FOR VENDOR CONTROLLEDDRAWING FOR PART NUMBER GENATOM-001 IS AS FOLLOWS: ADD AS SPECIFICATION 16, TO DRAWING (PROJECT 50031 L1 REV F.3 GENATOM-0001) SKYHOOK SHALL WITHSTAND A TEST LOAD (NONE) OF NOT LESS THAN 125% OF THE RATEDLOAD APPLIED IN ACCORDANCE WITH ASME B30.16 FOR A PERIOD OF TEN (10) MINUTESWITHOUT FAILURE. \
FEDERAL BUYER
Buyer and contracting office
Public points of contact
DOCUMENTS & LINKS
Opportunity documents
That does not mean there are no documents. Open the current SAM.gov notice to see the authoritative attachment and amendment list.
GovBidFit does not invent or cache guessed attachment links. The official SAM.gov notice remains the controlling document source.
NOTICE TIMELINE
GovBidFit change history
This timeline records when GovBidFit first stored the notice and material field changes detected during scheduled SAM.gov refreshes. It is an audit aid, not a substitute for the official amendment history.
GovBidFit first stored this opportunity from the SAM.gov public bulk feed. This does not replace the official posting date shown above.
GOVBIDFIT SCREENING LENS
What deserves attention before you spend bid time
These screening signals are generated from the public notice fields stored for this specific opportunity. They are not eligibility findings or predictions; they are prompts for a faster, more disciplined review of the official solicitation.
This record is in a solicitation stage, so submission instructions, evaluation factors, attachments and amendments should be reviewed before a bid/no-bid decision.
The stored response date leaves more than ten days, but amendments and pre-response milestones can shorten the usable preparation window.
The current feed does not show a program-specific set-aside restriction. That does not remove other eligibility, responsibility, registration or solicitation-specific requirements.
NAICS 332710 · PSC 4920 is the recorded classification. Use it as a screening clue, then compare the actual scope and deliverables rather than treating the code alone as proof of fit.
GovBidFit stores 2 notices tied to this solicitation. Review the notice chain and official SAM.gov history because later postings can change dates, scope or instructions.
GovBidFit stores the source notice text, but its length does not prove the requirements are complete. Review official attachments, clauses, amendments and Q&A before relying on the description.
The source data includes 1 public contracting contact. Use the solicitation's stated communication rules and deadlines before contacting the buyer.
Questions to resolve next
What this opportunity record tells you
SAM.gov identifies this as a solicitation from DEPT OF DEFENSE. The record was posted on October 15, 2026 and currently lists November 16, 2026 as the response deadline. GovBidFit keeps source facts separate from its matching guidance so you can see what comes from the federal notice.
The listed product or service classification is NAICS 332710 · Machine Shops · PSC 4920. The set-aside field is Unrestricted. These fields help narrow your search, but they do not replace the full solicitation, amendments, attachments, clauses or eligibility language on the official source.
Before deciding to bid
GovBidFit lets you browse federal contract opportunities for free and create free bid alerts. It displays public SAM.gov notice data stored in its database, with a compact snapshot as a fallback. GovBidFit is independent and is not a U.S. government website. Data can lag amendments or later source changes, so always verify the current notice, attachments and deadline on SAM.gov before bidding.
Open the official SAM.gov notice →