*** 18 September 2026 - Amendment W9127N26BA0240004 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement *** This amendment effects changes to the Block 14 (Description of Amendment/Modification): Solicitation Specifications, Section 31 68 13.00 99 � GROUND ANCHORS, Part 1 GENERAL, Paragraph 1.5.2 Qualifications are changed as detailed in the SUMMARY OF CHANGES. Solicitation Specifications, Section 31 73 20.00 99 � JET GROUTING, Part 1 GENERAL, Paragraph 1.7.1 Qualifications are changed as detailed in the SUMMARY OF CHANGES. Solicitation Specifications, Section 00 73 00 � Supplementary Conditions, Paragraph L. - COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984), the Period of Performance is amended as detailed in the SUMMARY OF CHANGES. This will allow for work to occur during the 2029 and 2030 In Water Work Window years. Environmental permits remain unchanged by this amendment. Marine Mammal protections as listed in the specification, and as governed by the IHA, included with the Attachments, remain in effect for the permitted years. No in water work, that is governed by IHA, will be allowed beyond the IHA permit years allowed. (SEE ATTACHED AMENDMENT FOR CHANGES) *** 09 September 2026 - Amendment W9127N26BA0240002 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement *** This amendment effects changes to the Block 14 (Description of Amendment/Modification): Solicitation Specifications, Section 01 57 19.00 25 - TEMPORARY ENVIRONMENTAL CONTROLS, Part 3 EXECUTION, Paragraph 3.4.3 PROFESSIONAL ARCHAEOLOGICAL MONITOR. (SEE ATTACHED AMENDMENT FOR CHANGES) *** 03 September 2026 - Amendment W9127N26BA0240002 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement*** This amendment effects changes to block 13 of Standard Form 1442, the Solicitation Specifications, Section 00 21 13 � Instruction to Bidders, and Section 00 21 00 � Instructions. Additionally, it extends the solicitation period and provides for an additional site visit. The Solicitation Period is extended by 20 calendar days which changes the Solicitation Closing Date from September 18, 2026, to October 8, 2026. Site Visit Registration. Send an email to Michael R. Carl via email at michael.r.carl@usace.army.mil and Courney R. Hollins at courtney.r.hollins@usace.army.mil by COB Wednesday, 09 September 2026, to register for the site visit and provide first name, last name, and company/organization name. Site visit attendees must be U.S. citizens and possess a REAL ID to access the site. Acceptable forms of proof of citizenship for anyone born outside the USA are: US Birth Certificate: Must be certified & issued by either a US State or the US State Department. US Passport Undamaged: Issued by the US Dept of State, without limitation, does not need to be current, is/was valid for 10 years for adults and 5 years for children under 16. US Passport Card Undamaged: Issued by the US Dept of State, without limitation, does not need to be current. US Certificate of Citizenship: Issued by US Citizenship and Immigration Service. Consular Report of Birth Abroad: Issued by the US State Department. US Naturalization Certificate: Issued by US Citizenship and Immigration Service. Enhanced Driver�s License: from Michigan, Minnesota, New York, Vermont, or Washington. Acceptable ID: Real ID driver�s license. Enhanced driver�s license. Federal Identification Cards PIC/CAC/PIV/Etc. Transportation Worker Identification Card (TWIC). United States Passport or United States Passport Card. Driver�s license issued by the Department of State. *** 27 August 2026 - Amendment W9127N26BA0240001 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement*** This amendment inserts additional Government Furnished Information (GFI) as an attachment to the solicitation. The file �Power Line Layout� is provided for the Contractor�s information. The Government shall not be responsible for any interpretation of, or conclusion drawn, from the data or information by the Contractor. Information provided should be field verified by the Contractor. If there is a discrepancy between the solicitation plan set and the GFI, the solicitation plan set takes precedence. The project consists of replacing the existing bridge with a new fixed bridge on a new alignment and to provide for partial demolition of the existing bridge. The new fixed bridge will be a single-span steel girder bridge with a concrete deck. The bridge width will be 34�4�� out-to-out, with two 11�0� travel lanes, two 2�0� shoulders, a 5�0� sidewalk, and the superstructure will consist of four (4) built-up steel plate girders. The replacement bridge alignment is located immediately downstream of the existing bridge and, at its northern terminus, will fit entirely between the existing bridge and the Bonneville Power Administration transmission tower which is located to the south. Approach roadways will also be constructed to tie into the existing roadway alignment. The new fixed bridge will be located over the existing navigation channel and will provide an under clearance that is larger than is currently present under the existing bridge. The north abutment will be a concrete stub abutment with spread footing anchored into rock. The south abutment will be a concrete abutment that is supported by drilled shafts. To mitigate seismic hazards, portions of the existing bridge will be removed as part of the bridge construction requirement. The existing bridge provides for critical vehicular access to the Bonneville project that must remain open for the entirety of the construction project. This will likely require the contractor to construct the project in phases. In addition, lead and asbestos removal will be required as part of this requirement. Working within environmental and seasonal restrictions and barge crane lifting will be required in close proximity to a high voltage power line will also be necessary during performance of the required work.
FEDERAL BUYER
Buyer and contracting office
Public points of contact
GOVBIDFIT SCREENING LENS
What deserves attention before you spend bid time
These screening signals are generated from the public notice fields stored for this specific opportunity. They are not eligibility findings or predictions; they are prompts for a faster, more disciplined review of the official solicitation.
This record is in a solicitation stage, so submission instructions, evaluation factors, attachments and amendments should be reviewed before a bid/no-bid decision.
The stored response date leaves more than ten days, but amendments and pre-response milestones can shorten the usable preparation window.
Small Business Set Aside - Total is recorded as the set-aside or restriction. Confirm the bidding entity actually satisfies the applicable program and size requirements before investing proposal time.
NAICS 237310 · PSC Y1LB is the recorded classification. Use it as a screening clue, then compare the actual scope and deliverables rather than treating the code alone as proof of fit.
GovBidFit stores 3 notices tied to this solicitation. Review the notice chain and official SAM.gov history because later postings can change dates, scope or instructions.
GovBidFit has stored substantive notice text for this record, but attachments, clauses, amendments and Q&A can still contain requirements that are not visible in the description alone.
The source data includes 2 public contracting contacts. Use the solicitation's stated communication rules and deadlines before contacting the buyer.
Questions to resolve next
What this opportunity record tells you
SAM.gov identifies this as a solicitation from DEPT OF DEFENSE. The record was posted on September 18, 2026 and currently lists October 8, 2026 as the response deadline. GovBidFit keeps source facts separate from its matching guidance so you can see what comes from the federal notice.
The listed product or service classification is NAICS 237310 · PSC Y1LB. The set-aside field is Small Business Set Aside - Total. These fields help narrow your search, but they do not replace the full solicitation, amendments, attachments, clauses or eligibility language on the official source.
Before deciding to bid
GovBidFit is independent and is not a U.S. government website. GovBidFit stores a structured mirror of SAM.gov public opportunity data in its own database and keeps the compact snapshot as a fallback. The official SAM.gov notice remains the controlling source. The official SAM.gov notice controls if anything here differs from the source or a later amendment.
Open the official SAM.gov notice →