GovBidFit database · SAM.gov sourceData refreshed September 20, 2026Official description stored

Combined Synopsis/Solicitation

CJAG Fence Install

Federal Combined Synopsis/Solicitation from DEPT OF DEFENSE for Ohio. Review the official description, buyer contacts, NAICS/PSC, set-aside, dates and…

SolicitationW9136426P0000040380
Notice typeCombined Synopsis/Solicitation
PostedSeptember 16, 2026
Response deadlineSeptember 21, 2026
Place of performanceRavenna, Ohio, 44266, USA
ClassificationNAICS 238990 · PSC Y1PZ
Set-asideSmall Business Set Aside - Total

OFFICIAL NOTICE CONTENT

Opportunity description

Stored from SAM.gov public data

Amendment 1 � Q&A � 16 Sep 26 Question1. The PWS references two 20-foot manual sliding security gates and also states that two 20-foot manual gate openings are to be installed. Please confirm whether the requirement is for two separate 20-foot manual sliding gate openings, or one 40-foot opening consisting of two 20-foot sliding gate leaves that close together. Answer 1: The requirement is for two separate 20-foot manual sliding gates. Question 2. Gate Configuration: PWS Paragraph 5.1 identifies two 20-foot manual sliding security gates, while Paragraph 5.1.5 references �swing clearance.� Please confirm whether the required gates are manual sliding gates, swing gates, or another configuration. Answer 2: The requirement is for two separate 20-foot manual sliding gates. Question 3. Field Measurements / Site Access: The PWS requires the contractor to verify all measurements prior to submitting a quotation. Will the Government conduct a scheduled site visit or otherwise provide access to Load Line 6 for prospective contractors to perform the required field verification before the quotation due date? Answer 3: Site visits can be scheduled by contacting CW2 Grant Stoner (614-336-6580, grant.m.stoner.mil@army.mil) or MAJ Kyle Miller (kyle.r.miller56.mil@army.mil). Question 4. Fence Alignment / Drawings: Are drawings, site plans, maps, or other documents available identifying the exact proposed fence alignment and locations of the two 20-foot gates? Answer 4: Yes, drawing is attached and ARNG will perform layout prior to fencing installation after the vegetation clearing is complete. Question 5. Completion Schedule: The PWS states a six-month period of performance from contract award; however, the solicitation instructions require a proposed schedule demonstrating completion prior to December 1, 2026. Please confirm whether December 1, 2026 is the mandatory completion deadline or whether the contractor will receive six months from the date of award. Answer 5: The contractor will receive a six-month period to complete the work, but the work should be scheduled immediately upon award of the contract, and if possible, the government would like completion prior to 1 December. Question 6. Underground Utilities: The PWS directs the contractor to coordinate with CJAG Department of Public Works to locate and mark underground utilities. Will CJAG/DPW perform the utility locating and marking at no cost to the contractor, or should the contractor include any associated utility-locate costs in its quotation? Answer 6: There are no live underground utilities in the area. Question 7. Permits: Are any local, state, installation, excavation, or construction permits required for this project? If so, please identify which permits the contractor is responsible for obtaining and paying for. Answer 7: The contractor must comply with the Ohio National Guard Environmental requirements, but no additional permits are required for this project. Question 8. Site Conditions / Clearing: Can the Government provide additional information or photographs showing the existing conditions along the approximately 3,850-linear-foot fence alignment, particularly the amount of brush, vegetation, grading, or other site preparation anticipated within the required 10-foot-wide clearing corridor? Answer 8: Fence line installation will be cleared to a minimum of 30 feet left and right of center via another project prior to fence installation. The area will be graded so that grass is planted and mowing can be accomplished. Question 9. Excess Soil / Disposal: May excess soil generated from the post-hole excavation be spread or relocated on Government property at a location designated by the COR, or must all excess soil be removed from Camp James A. Garfield and disposed of off-site? Answer 9: A minimum amount of excess soil may remain on the site if it can be spread to conform to the natural grade on the site. Question 10. Installation Access: Is there an anticipated processing timeframe for contractor and subcontractor personnel to obtain installation access/background-check approval? Additionally, are there any vehicle, equipment, escort, or badging requirements bidders should account for when developing their pricing and schedule? Answer 10: All access requirements are provided in the post award kick off meeting. There are no fees and no badging requirements. Question 11. Wage Requirements: Please confirm whether a Davis-Bacon Act wage determination or any other prevailing-wage requirement applies to this construction requirement. If applicable, please provide or identify the applicable wage determination. Answer 11: Wage determination for Ohio Heavy and highway applies and will be updated prior to award if a new version is available. OH20260001 07/30/2026 Question 12. Gate Hardware: Please confirm whether there are any specific requirements for gate latches, locking hardware, rollers/tracks, stops, drop rods, or other gate hardware beyond the requirements currently contained in the PWS and applicable UFS/UFC criteria. Answer 12: There are no additional requirements that are not in the PWS or applicable UFS criteria. Question 13. Government-Furnished Information: Are there any additional drawings, specifications, site photographs, utility information, or technical documents that will be provided by amendment before quotations are due? Answer 13: 01_sheets-fence-v3_redacted is the only drawing included. Request a site visit if additional information is required. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Amendment 1 - 10 Sep 2026 - Add POC for site visit, Added drawing, Added Q&A. Site Visits Encouraged - Call to schedule - Call 1SG Brian Persing 614-336-6975 or CW2 Grant Stoner 614-336-6580. Attachment added: 01_SHEETS-FENCE-V3.pdf Q&A Question 1. Gate Configuration: PWS Paragraph 5.1 identifies two 20-foot manual sliding security gates, while Paragraph 5.1.5 references �swing clearance.� Please confirm whether the required gates are manual sliding gates, swing gates, or another configuration. Answer 1. Manual sliding gates Question 2. Field Measurements / Site Access: The PWS requires the contractor to verify all measurements prior to submitting a quotation. Will the Government conduct a scheduled site visit or otherwise provide access to Load Line 6 for prospective contractors to perform the required field verification before the quotation due date? Answer 2. Can either have a scheduled site visit day or be available when needed by appointment with prospective contactors, although until clearing is complete not much to see. Question 3. Fence Alignment / Drawings: Are drawings, site plans, maps, or other documents available identifying the exact proposed fence alignment and locations of the two 20-foot gates? Answer 3. Fence Alignment drawing was provided (also see attached here, once clearing is complete, BDE 12T assets will be used to layout alignment. Question 4. Completion Schedule: The PWS states a six-month period of performance from contract award; however, the solicitation instructions require a proposed schedule demonstrating completion prior to December 1, 2026. Please confirm whether December 1, 2026 is the mandatory completion deadline or whether the contractor will receive six months from the date of award. Answer 4. Complete prior to December 1 is preferred, also cant start until after clearing is complete in late September / October Question 5. Underground Utilities: The PWS directs the contractor to coordinate with CJAG Department of Public Works to locate and mark underground utilities. Will CJAG/DPW perform the utility locating and marking at no cost to the contractor, or should the contractor include any associated utility-locate costs in its quotation? Answer 5. no active utilities in the area Question 6. Permits: Are any local, state, installation, excavation, or construction permits required for this project? If so, please identify which permits the contractor is responsible for obtaining and paying for. Answer 5. This project is covered under the C-JAG Storm Water Construction Permit and the contractor will have to attend a brief training on the SWP3, submit a co-permittee NOI, sign a Contractor certification form, install additional sediment and erosion controls if necessary, comply with fueling requirements and spill kits, comply with concrete outwash, level ruts, prepare seed bed, and seed and straw all bare earth areas they create. Question 7. Site Conditions / Clearing: Can the Government provide additional information or photographs showing the existing conditions along the approximately 3,850-linear-foot fence alignment, particularly the amount of brush, vegetation, grading, or other site preparation anticipated within the required 10-foot-wide clearing corridor? Answer 7. A site visit is authorized Question 8. Excess Soil / Disposal: May excess soil generated from the post-hole excavation be spread or relocated on Government property at a location designated by the COR, or must all excess soil be removed from Camp James A. Garfield and disposed of off-site? Answer 8. Soil can be spread in the clear zone and a seed bed prepared and all bare earth areas seeded with a C-JAG approved turf grass mix and mulched with 2� to 3� of straw cover. Question 9. Installation Access: Is there an anticipated processing timeframe for contractor and subcontractor personnel to obtain installation access/background-check approval? Additionally, are there any vehicle, equipment, escort, or badging requirements bidders should account for when developing their pricing and schedule? Answer 9. An access roster will be provided, valid drivers license or photo ID must be present at all times. Question 10. Wage Requirements: Please confirm whether a Davis-Bacon Act wage determination or any other prevailing-wage requirement applies to this construction requirement. If applicable, please provide or identify the applicable wage determination. Answer 10. Yes Davis-Bacon Act applies. Question 11. Gate Hardware: Please confirm whether there are any specific requirements for gate latches, locking hardware, rollers/tracks, stops, drop rods, or other gate hardware beyond the requirements currently contained in the PWS and applicable UFS/UFC criteria. Answer 11. There are no additional hardware requirements besides those contained in the PWS and UFS. Question 12. Government-Furnished Information: Are there any additional drawings, specifications, site photographs, utility information, or technical documents that will be provided by amendment before quotations are due? Answer 12. No Question 13. What is the Height of the fence? Answer 13. The fence height is 8 feet, with a minimum of 7 feet of fabric plus the top guard outrigger and barbed wire. Question 14. Is the contractor to install a slide gate or swing gate? Answer 14. Slide Gate Question 15. Are the fence and footers to be removed by installation contractor? Answer 15. Old fence will be removed prior to start of work. Question 16. Can the footers and fence be left on site? Answer 16. No Question 17. Does the fence need to be grounded? If so, how often does it need to be grounded? Answer 17. Grounding is not required for this project. Question 18. What your spec on FE-6, we want to make sure we don�t have tension wire, rods, barbed wire on the inside and outside ect. Answer 18. Not sure what the question is. Question 19. Confirm which specific portions of the project require integrated intrusion detection systems (sensored) versus standard perimeter fencing (non-sensored) to select the correct detail (FEN-03 vs. FEN-04). Answer 19. There will be no intrusion detection systems on the fence. Question 20. Review Hardware: High-security specifications (ASTM F626) mandate specific fittings, tension bands, and tie wires. Ensure your material take-off accounts for these high-security grade accessories rather than standard commercial hardware. Answer 20. Not high security specs Question 21. Confirm Gate Requirements: Refer to the FEN-09 detail specifically for any swing or cantilever gates, as these have distinct framing, post size (often 4-inch or 6 5/8-inch OD depending on width), and bracing requirements compared to the main fence line. Answer 21. Manual sliding gates ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Construction of approximately 3,850 linear feet of FE-6 security fencing, including two 20-foot manual security gates, at Load Line 6, Camp James A. Garfield, Ravenna, Ohio Site visits are encouraged - call 1SG Brian Persing 330-984-8130 or CW2 Grant Stoner 614-336-6580. Only contact for site visits, all other questions are submitted to barry.b.beale.civ@army.mil

FEDERAL BUYER

Buyer and contracting office

View buyer page →
Department / agencyDEPT OF DEFENSE
Sub-tierDEPT OF THE ARMY
Contracting officeW7NU USPFO ACTIVITY OH ARNG
Office addressCOLUMBUS, OH, 43235-2712, USA

Public points of contact

PrimaryBarry Bealebarry.b.beale.civ@army.mil

GOVBIDFIT SCREENING LENS

What deserves attention before you spend bid time

Decision support

These screening signals are generated from the public notice fields stored for this specific opportunity. They are not eligibility findings or predictions; they are prompts for a faster, more disciplined review of the official solicitation.

Active solicitation stage

This record is in a solicitation stage, so submission instructions, evaluation factors, attachments and amendments should be reviewed before a bid/no-bid decision.

Very short response window

The stored deadline is within three days. Check earlier question, site-visit and attachment requirements immediately; the final response date may not be the first deadline that matters.

Eligibility gate recorded

Small Business Set Aside - Total is recorded as the set-aside or restriction. Confirm the bidding entity actually satisfies the applicable program and size requirements before investing proposal time.

Classification signal

NAICS 238990 · PSC Y1PZ is the recorded classification. Use it as a screening clue, then compare the actual scope and deliverables rather than treating the code alone as proof of fit.

Notice history exists

GovBidFit stores 3 notices tied to this solicitation. Review the notice chain and official SAM.gov history because later postings can change dates, scope or instructions.

Official description available

GovBidFit has stored substantive notice text for this record, but attachments, clauses, amendments and Q&A can still contain requirements that are not visible in the description alone.

Public buyer contact available

The source data includes 1 public contracting contact. Use the solicitation's stated communication rules and deadlines before contacting the buyer.

Questions to resolve next

Has SAM.gov posted an amendment or changed the response date, attachments or submission instructions since this GovBidFit snapshot was refreshed?Are there question deadlines, site visits, registrations or internal approvals that occur before the final response date?Does the bidding entity hold the required current status for the recorded set-aside and the solicitation's assigned NAICS size standard?Can the business perform in Ohio at a sustainable cost after travel, mobilization, staffing, licensing and subcontractor requirements are considered?Which related notice or amendment currently controls the response instructions?

What this opportunity record tells you

SAM.gov identifies this as a combined synopsis/solicitation from DEPT OF DEFENSE. The record was posted on September 16, 2026 and currently lists September 21, 2026 as the response deadline. GovBidFit keeps source facts separate from its matching guidance so you can see what comes from the federal notice.

The listed product or service classification is NAICS 238990 · PSC Y1PZ. The set-aside field is Small Business Set Aside - Total. These fields help narrow your search, but they do not replace the full solicitation, amendments, attachments, clauses or eligibility language on the official source.

Before deciding to bid

Read the complete official description and scope. Verify the exact response date, time and time zone on SAM.gov. Confirm NAICS/PSC and every set-aside eligibility requirement. Review attachments, amendments, Q&A and submission instructions. Check place of performance, staffing, insurance, bonding and execution requirements.
Source and trust

GovBidFit is independent and is not a U.S. government website. GovBidFit stores a structured mirror of SAM.gov public opportunity data in its own database and keeps the compact snapshot as a fallback. The official SAM.gov notice remains the controlling source. The official SAM.gov notice controls if anything here differs from the source or a later amendment.

Open the official SAM.gov notice →