OFFICIAL NOTICE CONTENT
Opportunity description
The U.S. Army Corps of Engineers, New England District is issuing a Sources Sought Announcement for the upcoming dredging project located in Providence, Rhode Island. This announcement is to determine the interest, availability and capability of Small and Large Business concerns as described below. The NAICS code for this procurement is 237990. The solicitation for this project is anticipated to be issued on or about 15 March 2027. The construction will begin in September 2027 and is expected to take approximately 2 years to complete. The estimated construction cost is between $80,000,000 and $100,000,000. The Providence River Maintenance Dredging project involves two major sequences of dredging and disposal activities. The first work sequence will be the construction of a new Confined Aquatic Disposal (CAD) cell adjacent to the Providence River. The second work sequence under this contract will include maintenance dredging of the Providence River and Harbor Federal Navigation Project (FNP) to its authorized depths and dimensions. The proposed work consists of mechanically dredging approximately 5,500,000 cubic yards (cy) of material using closed clamshell buckets for both major sequences of work over the course of two years. The new CAD cell will be in the Edgewood Basin area located adjacent to the Providence FNP (hereafter the �Edgewood Shoals North (ESN) CAD cell�). To access the CAD cell area, an access channel will be dug between the Providence FNP and the CAD cell area. The access channel will be approximately 100 ft wide and -25 MLLW deep. The CAD cell will have surface dimensions of approximately 1000 ft. by 1000 ft. and be dug to a depth of -60 MLLW. The material excavated to build the access channel is generally a mix of sandy silt and shell fragments. Within the CAD cell area the material is generally described as soft grey to black organic silt with some layers of firm sandy silt and some shell fragments and coarse-grained material. Material excavated from the access channel and CAD cell area will be placed at four locations: Port Edgewood Basin, the Fox Point Reach CAD cells, Prudence Island Disposal Site, and the Rhode Island Sound Disposal Site. This work consists of mechanically dredging approximately 3,200,000 cy to construct thew ESN CAD cell and its access channel, which must be completed before maintenance dredging of the FNP can begin. The maintenance dredging proposed work consists of mechanically dredging the Providence River FNP to the full -40 MLLW depth plus 2-feet of allowable overdepth. 2,300,000 cy (1,200,000 cy required depth, with up to 1,100,000 cy overdepth) of shoaled material consisting generally of poorly graded medium to fine sand with silt. The dredge material from this maintenance portion of work will be placed in the ESN CAD cell. Environmental coordination and permitting is being completed by the U.S. Army of Engineers, New England District. All dredging and disposal activities for this project have prescribed work windows that incorporate environmental and recreational time of year restrictions. Refer to the Draft Specification Section provided with this announcement for specifics on the time of year work restrictions. In order to accomplish all dredging requirements within the specified dredging window it is expected that the Contractor will need to meet a production rate of 300,000 CY per 30 calendar days. The U.S. Army Corps of Engineers, New England District is requesting responses to the questions below from both small and large businesses[MC1] . Draft drawings showing a concept design plan and draft Specification Section of 01 11 00 SUMMARY OF WORK have been provided with this announcement to help provide more context for the contract work and responses to these questions. Considering the different disposal locations, are there suggestions on a bid structure that will provide for the most accurate costs of different disposal locations? Any draft restrictions that may impact dredging and/or disposal operations? Any concerns on the period of performance of September 2027 to September 2029 considering the environmental windows and amount of work? If so, why? Any comments about the bed leveling planned in the Fox Point Reach? Are there concerns about this part of the plan, if so, why? Interested firms should also demonstrate their project experience, by providing two (2) projects within the last ten years, which meet the following requirements: Dredging by mechanical means demonstrating a minimum production rate of 300,000 cubic yards in one consecutive 30-day period. Experience with placement of dredged material at an open water placement site in New England during the fall/winter months of October through March. Interested firms should submit a capabilities package to include the following: business classification (i.e. HUBZone, etc.), type of equipment the firm is proposing to use on the project, and two (2) example projects performed by the firm in the last ten (10) years (including Points of Contact for those projects) showing experience with the proposed equipment at the production rate listed above. Please indicate the team subcontractor(s) (if any), including their prior experience and qualifications meeting the same qualifications listed above, which will be used to support the bidder's effort. Firms may use subcontractor experience to demonstrate experience with the requirements, but the role and work performed by each team member (prime and subcontractors) on projects demonstrating that team member's experience shall be the same as the role for that team member for this project. Bid bond will need to be provided with the bid. Responses are limited to twenty pages and due by December 03 , 2026. Responses should be addressed to the U.S. Army Corps of Engineers, New England District, 696 Virginia Road, Concord, MA 01742-2751, ATTN: Kyle Hall, or electronically to Kyle.K.Hall@usace.army.mil. The Government will not pay for any material provided in response to this market survey nor return the data provided. This notice is for information purposes only and is not a request to be placed on a solicitation mailing list nor is it a Request for Proposal (RFP) or an announcement of a solicitation. The results of this survey will be considered to be in effect for a period of one year from the date of this notice. Government Agency URL: www.nae.usace.army.mil Government Agency URL Description: New England District, Corps of Engineers
FEDERAL BUYER
Buyer and contracting office
Public points of contact
DOCUMENTS & LINKS
Opportunity documents
That does not mean there are no documents. Open the current SAM.gov notice to see the authoritative attachment and amendment list.
GovBidFit does not invent or cache guessed attachment links. The official SAM.gov notice remains the controlling document source.
NOTICE TIMELINE
GovBidFit change history
This timeline records when GovBidFit first stored the notice and material field changes detected during scheduled SAM.gov refreshes. It is an audit aid, not a substitute for the official amendment history.
GovBidFit first stored this opportunity from the SAM.gov public bulk feed. This does not replace the official posting date shown above.
GOVBIDFIT SCREENING LENS
What deserves attention before you spend bid time
These screening signals are generated from the public notice fields stored for this specific opportunity. They are not eligibility findings or predictions; they are prompts for a faster, more disciplined review of the official solicitation.
This notice appears to be market research rather than a conventional bid invitation. A capability response, technical feedback or evidence of market interest may matter more than a price proposal at this stage.
The stored response date leaves more than ten days, but amendments and pre-response milestones can shorten the usable preparation window.
The current feed does not show a program-specific set-aside restriction. That does not remove other eligibility, responsibility, registration or solicitation-specific requirements.
NAICS 237990 is the recorded classification. Use it as a screening clue, then compare the actual scope and deliverables rather than treating the code alone as proof of fit.
GovBidFit stores 2 notices tied to this solicitation. Review the notice chain and official SAM.gov history because later postings can change dates, scope or instructions.
GovBidFit stores the source notice text, but its length does not prove the requirements are complete. Review official attachments, clauses, amendments and Q&A before relying on the description.
The source data includes 1 public contracting contact. Use the solicitation's stated communication rules and deadlines before contacting the buyer.
Questions to resolve next
What this opportunity record tells you
SAM.gov identifies this as a sources sought from DEPT OF DEFENSE. The record was posted on October 28, 2026 and currently lists December 3, 2026 as the response deadline. GovBidFit keeps source facts separate from its matching guidance so you can see what comes from the federal notice.
The listed product or service classification is NAICS 237990 · Other Heavy and Civil Engineering Construction. The set-aside field is Unrestricted. These fields help narrow your search, but they do not replace the full solicitation, amendments, attachments, clauses or eligibility language on the official source.
Before deciding to bid
GovBidFit lets you browse federal contract opportunities for free and create free bid alerts. It displays public SAM.gov notice data stored in its database, with a compact snapshot as a fallback. GovBidFit is independent and is not a U.S. government website. Data can lag amendments or later source changes, so always verify the current notice, attachments and deadline on SAM.gov before bidding.