OFFICIAL NOTICE CONTENT
Opportunity description
A Market Survey is being conducted to gather information and feedback from the construction industry to help shape the acquisition strategy for this Design-Build-to-Budget project. The Government is seeking input from all interested business concerns, including Large Businesses, Small Businesses, and certified HUBZone, 8A, Woman-Owned, and Service-Disabled Veteran-Owned Small Businesses. The information gathered will be used to refine the Government's procurement approach for this project delivery method and to determine the potential for a Small Business Set-Aside. If your firm is interested in this project as a prime contractor, please respond appropriately. Project Location: Fort McCoy, WI Project Title: Fort McCoy Multipurpose Athletic Field � Army Combat Fitness Testing Project Description: This project will be solicited as a Design-Build-to-Budget project. The purpose of this solicitation method is to maximize the achievable scope within a target budget ceiling (currently estimated at $14,676,000). The Design-Build to Budget project will consist of a contractual budget ceiling for which contractors will propose the quantities, configurations, construction type and other innovations that the proposing contractor can complete within the budget ceiling. Negotiations will occur with those offerors invited to Phase II to finalize the scope and cost after receipt of initial proposals. The goal is to allow maximum flexibility in design and construction. The Government intends to only include the basic requirements in the RFP. This will be a two (2) phase Design-Build procurement. Fort McCoy has no facility large enough to allow indoor Army�s Holistic Health and Fitness (H2F) system activities or Army Fitness Test (AFT) testing in the winter months or during weather events. Currently outdoor activities are conducted on an existing Physical Training area consisting of an outdoor running track and a hand-to-hand combat training area. Students are required to complete the AFT outdoors in inhospitable conditions or must try to obtain a waiver for this component of their class. The site does not provide protected areas from the elements for the Soldiers during or in-between events. This project will utilize a Design-Build-to-Budget delivery method to design and construct a new facility to contain a 54,600 SF multipurpose athletic field at Fort McCoy, Wisconsin. The facility shall consist of a 200 meter rubberized running track and an artificial turf infield (sized according to Army Techniques Publication (ATP) 7-22.01 Holistic Health and Fitness Training requirements) for completing the annual Army Fitness Testing (AFT). Supporting facilities include site development, modification to existing improvements, utilities and connections, lighting, paving, sidewalks, storm drainage, information systems, landscaping and signage. Consistent temperature control inside the facility shall be provided by self-contained systems. ATFP measures in accordance with the Department of Defense (DoD) Antiterrorism for Buildings will be provided. A life safety analysis of the facility shall be conducted to determine compliance with UFC, IBC, and NFPA codes and standards. A new addressable fire alarm system shall be installed in the facility that is compatible with the existing base fire alarm reporting system. Comprehensive building design services shall be required. Accessibility for individuals with disabilities shall be required. The multipurpose athletic field will be periodically occupied and shall require adequate clearance and circulation for personnel, maintenance and operations. Utility connections and telecommunications system(s) shall be coordinated. The facility shall be designed to a minimum life of 40 years and in accordance with DoD's Unified Facilities Criteria (UFC) 1-200-02 High Performance and Sustainable Building Requirements including energy efficiencies, building envelope, and integrated building systems performance. This is not a continuously used facility, and during periods of non-use utilities will be reduced or disconnected to conserve energy. The available funding for this project is capped at $14,676,000. Prospective offerors should design to, and propose a price that approaches, this maximum budget to maximize the technical value and betterments offered to the Government. Any proposal exceeding this $14,676,000 cap will be deemed non-compliant and ineligible for award. NAICS code is 236220 (Commercial and Institutional Building Construction). All interested prime contractors should respond to this survey via email by 17 October 2026 by 11:59 PM Eastern Time. Responses should include: Identification and verification of the company�s size status under NAICS 236220 (Large Business, Small Business, and certified HUBZone, 8A, Woman-Owned, and Service-Disabled Veteran-Owned Small Businesses) Contractor�s Unique Entity Identifier (UEI) Number and CAGE Code(s). Information on the Contractor�s ability to be bonded showing current single and aggregate performance and payment bond limits. Descriptions of Experience � Interested construction firms must provide no more than three (3) example projects with either 95% completion or projects completed in the past six (6) years where the interested firm served as the Prime Contractor. Each project must include the following: a. Name b. Title c. Project Role d. Email Address e. Telephone Number f. At least one (1) reference. References may be used to verify project size, scope, dollar value, percentages, and quality of performance. Documentation/Information demonstrating experience managing multiple sub-contractors. Example projects must be of similar size and scope. a. Projects similar in scope to this project include: (1) Artificial turf athletic fields, running tracks, building foundations. b. Projects similar in size to this project include: (1) Projects having a combined square footage of at least 40,000 SF. c. Based on the information above, for each project submitted, include: (1) Current percentage of construction complete and the date when it was or will be completed. (2) Size of the project (combined SF, acres of construction site, etc.) (3) Scope of the project (specific trades, site work, utility connections, mechanical systems, HVAC commissioning, roof systems, etc.) (4) The dollar value of the construction contract and project delivery method (whether it was Design-Bid Build, Design-Build, Design-Build-to-Budget, Progressive Design-Build, CMAR, etc.). (5) The portion and percentage of work that was self-performed. Describe the work your company self-performed. Must be at least 15% self-performed. Prescriptive "Showstoppers": Are there any requirements in our functional description that appear overly prescriptive or "locked-in" that might prevent you from offering a more innovative or cost-effective solution to meet the mission? Innovation Opportunities: In this building type, where do you typically see the most opportunity for an integrated design-build team to provide "more for the money" (e.g., modular systems, envelope efficiency, MEP coordination)? Long-Lead Warning: Even without a full design, are there specific systems common to this facility type (e.g., generators, custom AHUs, specialized equipment) that are currently experiencing lead times that would threaten the proposed project schedule? Local Labor Constraints: Are there specific trades in the project area that are currently over-extended or in short supply that could impact the project's risk profile? The prime contrcactor must perform at least 15% of the cost of the contract, not including the cost of materials, with the firm�s own employees for general construction-type procurement. Include the percentage of work that will be self-performed on this project, and how it will be accomplished. Stipend Information & Questions The Government is considering offering a stipend to unsuccessful offerors in Phase II of this Two-Phase Design-Build-to-Budget procurement. Stipends may be used to encourage participation and competition from highly qualified firms, particularly when a project requires significant design effort and up-front proposal costs. Your feedback is crucial for our market research and will help inform the acquisition strategy for this project. Please provide a response to the following questions: Influence on Participation: Would the availability of a stipend impact your firm's decision to invest the resources required to compete in Phase II of this procurement? Please explain why or why not. Proposal Quality: If a stipend were offered, would it encourage your firm to dedicate more resources toward developing a more detailed, comprehensive, or innovative design proposal? Barriers to Competition: For a Design-Build-to-Budget project of this size (~$14.6M) and scope, what are the primary challenges or cost drivers your firm anticipates in preparing a Phase II technical proposal? Stipend Value: While not a commitment, what stipend amount (e.g., a specific dollar figure or a percentage of your estimated proposal cost) would you consider to be a meaningful incentive for participation in Phase II? Effective Incentives: In a fixed-budget environment, what types of post-award contract incentives are most effective at motivating your team to exceed minimum performance requirements? NOTE: Total submittal package shall be no longer than ten (10) pages. Please only include a narrative of the requested information; additional information will not be reviewed. Email responses to Bonny.C.Dylewski@usace.army.mil and Jesse.E.Scharlow@usace.army.mil. This is NOT a Request for Proposal and does not constitute any commitment by the Government. Responses to this source sought notice will be used by the Government to make appropriate acquisition decisions. All interested sources must respond to future solicitation announcements separately from responses to this Market Survey. NOTICE: The following information is provided for situational awareness and is not required to respond to this Sources Sought. All contractors must be registered in the System for Award Management (www.SAM.gov) prior to award of a contract. All proposed contractors are highly encouraged to review clause 52.232-3- Payments by Electronic Funds Transfer � System for Award Management which indicates �All payments by the Government under this contract shall be made by electronic funds transfer (EFT).� Those not currently registered can obtain registration by going to the website https://www.SAM.gov. The process can usually be completed from 24 to 48 hours after submission. Contractors will need to obtain a Unique Entity Identifier (UEI) for processing their registration. If you do not already have a Unique Entity Identifier, one can be obtained from https://www.SAM.gov. Please begin the registration process immediately to avoid delay of the contract award should your firm be selected. PARTNERING WITH US: https://www.usace.army.mil/Business-With-Us/Partnering/
FEDERAL BUYER
Buyer and contracting office
Public points of contact
DOCUMENTS & LINKS
Opportunity documents
That does not mean there are no documents. Open the current SAM.gov notice to see the authoritative attachment and amendment list.
GovBidFit does not invent or cache guessed attachment links. The official SAM.gov notice remains the controlling document source.
NOTICE TIMELINE
GovBidFit change history
This timeline records when GovBidFit first stored the notice and material field changes detected during scheduled SAM.gov refreshes. It is an audit aid, not a substitute for the official amendment history.
GovBidFit first stored this opportunity from the SAM.gov public bulk feed. This does not replace the official posting date shown above.
GOVBIDFIT SCREENING LENS
What deserves attention before you spend bid time
These screening signals are generated from the public notice fields stored for this specific opportunity. They are not eligibility findings or predictions; they are prompts for a faster, more disciplined review of the official solicitation.
This notice appears to be market research rather than a conventional bid invitation. A capability response, technical feedback or evidence of market interest may matter more than a price proposal at this stage.
The stored deadline is within ten days. Build an internal submission deadline and verify whether questions, site visits, registrations or approvals are due earlier.
The current feed does not show a program-specific set-aside restriction. That does not remove other eligibility, responsibility, registration or solicitation-specific requirements.
NAICS 236220 · PSC Y1FB is the recorded classification. Use it as a screening clue, then compare the actual scope and deliverables rather than treating the code alone as proof of fit.
GovBidFit stores 2 notices tied to this solicitation. Review the notice chain and official SAM.gov history because later postings can change dates, scope or instructions.
GovBidFit stores the source notice text, but its length does not prove the requirements are complete. Review official attachments, clauses, amendments and Q&A before relying on the description.
The source data includes 1 public contracting contact. Use the solicitation's stated communication rules and deadlines before contacting the buyer.
Questions to resolve next
What this opportunity record tells you
SAM.gov identifies this as a sources sought from DEPT OF DEFENSE. The record was posted on October 7, 2026 and currently lists October 17, 2026 as the response deadline. GovBidFit keeps source facts separate from its matching guidance so you can see what comes from the federal notice.
The listed product or service classification is NAICS 236220 · Commercial and Institutional Building Construction · PSC Y1FB. The set-aside field is Unrestricted. These fields help narrow your search, but they do not replace the full solicitation, amendments, attachments, clauses or eligibility language on the official source.
Before deciding to bid
GovBidFit lets you browse federal contract opportunities for free and create free bid alerts. It displays public SAM.gov notice data stored in its database, with a compact snapshot as a fallback. GovBidFit is independent and is not a U.S. government website. Data can lag amendments or later source changes, so always verify the current notice, attachments and deadline on SAM.gov before bidding.
Open the official SAM.gov notice →