OFFICIAL NOTICE CONTENT
Opportunity description
Q1: Under page 6 para 4.4, the SOW requires: "Generator/AS Integration Testing (as needed)..." What are the Makes, Models, S/Ns, and years of manufacture of the CAT generators (or other generators, that connect to these ATSs or associated equipment), so we can conduct the load banking as requested?" The CAT gens are 650 kw and 2250 kw. Load banking would only be needed if during the process it is needed for investigative purposes or to prove out repairs. Q2: "Does the government want CAT to accomplish or aid in the accomplishment of task 1 under para 4.4 "Remove/reconnect bias signals during generator tuning (if required)?" The use of CAT to carry out any tasks would be at the vendors discretion. Q3: "Does the government want CAT to accomplish or aid in the accomplishment of task 2 under para 4.4 "Remove/reconnect bias signals during generator tuning (if required)?" The use of CAT to carry out any tasks would be at the vendors discretion. Q4: If we are an authorized CAT generator service company, can we complete the tasks under para 4.4 without bringing in CAT? Yes Q5: The SOW states, "The solicitation requests, "Recommendations for future reliability improvement." (page 6, para 4.5)," and the main task is "repair services for facility switchgear and ATS systems that are malfunctioning." What will the government allow under this solicitation if the work required to accomplish the main task is outside the scope of the SOW. That is, will the government modify an award if more substantial repairs are required? � Under this contract, the government is looking for the vendor to establish what the issues with the system are and to repair those issues to have a fully operational system. The recommendations for improvement if directly associated to bring the system back to operational status would be considered part of repairs. Any recommendations that would assist in the future that are not required at this time to make the system functional would be submitted to the government for future contractual consideration. What are the total quantities and types of breakers, and what are their amperage ratings and trip-unit manufacturers/models? The purpose of the site visit was for the vendor to get the information required. GE/ABB/ASCO. Contract is investigative/repair and vendor will acquire information during performance. What breaker testing methods are expected, including whether primary- or secondary-injection testing is required? No expectations. Testing will be accomplished IAW NFPA 70 B and E. What are the quantities and types/models of protective relays requiring inspection or testing? The purpose of the site visit was for the vendor to get the information required. Contract is investigative/repair and vendor will acquire information during performance. What types and quantities of switches are included in the scope? The purpose of the site visit was for the vendor to get the information required. Contract is investigative/repair and vendor will acquire information during performance. Is any gear located on mezzanines? Is there suitable access and space near the electrical rooms to stage a generator and test equipment?� No equipment is on mezzanine. Room is available. Are equipment photos or an equipment schedule available? The purpose of the site visit was for the vendor to get the information required. Contract is investigative/repair and vendor will acquire information during performance. What are the total quantities and types of breakers, and what are their amperage ratings and trip-unit manufacturers/models? The purpose of the site visit was for the vendor to get the information required. GE/ABB/ASCO. Contract is investigative/repair and vendor will acquire information during performance. What breaker testing methods are expected, including whether primary- or secondary-injection testing is required? No expectations. Testing will be accomplished IAW NFPA 70 B and E. What are the quantities and types/models of protective relays requiring inspection or testing? The purpose of the site visit was for the vendor to get the information required. Contract is investigative/repair and vendor will acquire information during performance. What types and quantities of switches are included in the scope? The purpose of the site visit was for the vendor to get the information required. Contract is investigative/repair and vendor will acquire information during performance. Is any gear located on mezzanines? Is there suitable access and space near the electrical rooms to stage a generator and test equipment?� No equipment is on mezzanine. Room is available. Are equipment photos or an equipment schedule available? The purpose of the site visit was for the vendor to get the information required. Contract is investigative/repair and vendor will acquire information during performance.
FEDERAL BUYER
Buyer and contracting office
Public points of contact
DOCUMENTS & LINKS
Opportunity documents
That does not mean there are no documents. Open the current SAM.gov notice to see the authoritative attachment and amendment list.
GovBidFit does not invent or cache guessed attachment links. The official SAM.gov notice remains the controlling document source.
NOTICE TIMELINE
GovBidFit change history
This timeline records when GovBidFit first stored the notice and material field changes detected during scheduled SAM.gov refreshes. It is an audit aid, not a substitute for the official amendment history.
GovBidFit first stored this opportunity from the SAM.gov public bulk feed. This does not replace the official posting date shown above.
GOVBIDFIT SCREENING LENS
What deserves attention before you spend bid time
These screening signals are generated from the public notice fields stored for this specific opportunity. They are not eligibility findings or predictions; they are prompts for a faster, more disciplined review of the official solicitation.
This record is in a solicitation stage, so submission instructions, evaluation factors, attachments and amendments should be reviewed before a bid/no-bid decision.
The stored deadline is within three days. Check earlier question, site-visit and attachment requirements immediately; the final response date may not be the first deadline that matters.
The current feed does not show a program-specific set-aside restriction. That does not remove other eligibility, responsibility, registration or solicitation-specific requirements.
NAICS 811310 · PSC J061 is the recorded classification. Use it as a screening clue, then compare the actual scope and deliverables rather than treating the code alone as proof of fit.
GovBidFit stores 2 notices tied to this solicitation. Review the notice chain and official SAM.gov history because later postings can change dates, scope or instructions.
GovBidFit stores the source notice text, but its length does not prove the requirements are complete. Review official attachments, clauses, amendments and Q&A before relying on the description.
The source data includes 1 public contracting contact. Use the solicitation's stated communication rules and deadlines before contacting the buyer.
Questions to resolve next
What this opportunity record tells you
SAM.gov identifies this as a combined synopsis/solicitation from VETERANS AFFAIRS, DEPARTMENT OF. The record was posted on November 13, 2026 and currently lists November 18, 2026 as the response deadline. GovBidFit keeps source facts separate from its matching guidance so you can see what comes from the federal notice.
The listed product or service classification is NAICS 811310 · Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance · PSC J061. The set-aside field is Unrestricted. These fields help narrow your search, but they do not replace the full solicitation, amendments, attachments, clauses or eligibility language on the official source.
Before deciding to bid
GovBidFit lets you browse federal contract opportunities for free and create free bid alerts. It displays public SAM.gov notice data stored in its database, with a compact snapshot as a fallback. GovBidFit is independent and is not a U.S. government website. Data can lag amendments or later source changes, so always verify the current notice, attachments and deadline on SAM.gov before bidding.
Open the official SAM.gov notice →