OFFICIAL NOTICE CONTENT
Opportunity description
This scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab�s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab�s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 � 60 Calendar Days after issuance of Notice to Proceed (NTP). This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 � 4th January 2028; This milestone marks the point where access is permitted inside Kautz Road Substation yard and construction work may begin. Milestone 3 � 31st of March 2028; This milestone marks the completion of building foundation and ready for placement of the new prefabricated control house building (provided by FermiForward). Milestone 4 � 2nd July 2029; This milestone marks the formal issuance of an Authorization for Use and Possession (AUP) of the KRS Substation facility, including all remedial work following removal of site trailers, but not including seasonal work and all final punch list items addressed.. Milestone 5 � 30th September 2029; This milestone marks the completion of the project.
FEDERAL BUYER
Buyer and contracting office
Public points of contact
DOCUMENTS & LINKS
Opportunity documents
That does not mean there are no documents. Open the current SAM.gov notice to see the authoritative attachment and amendment list.
GovBidFit does not invent or cache guessed attachment links. The official SAM.gov notice remains the controlling document source.
NOTICE TIMELINE
GovBidFit change history
This timeline records when GovBidFit first stored the notice and material field changes detected during scheduled SAM.gov refreshes. It is an audit aid, not a substitute for the official amendment history.
GovBidFit first stored this opportunity from the SAM.gov public bulk feed. This does not replace the official posting date shown above.
GOVBIDFIT SCREENING LENS
What deserves attention before you spend bid time
These screening signals are generated from the public notice fields stored for this specific opportunity. They are not eligibility findings or predictions; they are prompts for a faster, more disciplined review of the official solicitation.
This record is in a solicitation stage, so submission instructions, evaluation factors, attachments and amendments should be reviewed before a bid/no-bid decision.
The stored response date leaves more than ten days, but amendments and pre-response milestones can shorten the usable preparation window.
No Set aside used is recorded as the set-aside or restriction. Confirm the bidding entity actually satisfies the applicable program and size requirements before investing proposal time.
NAICS 237130 · PSC Z2MZ is the recorded classification. Use it as a screening clue, then compare the actual scope and deliverables rather than treating the code alone as proof of fit.
GovBidFit stores the source notice text, but its length does not prove the requirements are complete. Review official attachments, clauses, amendments and Q&A before relying on the description.
The source data includes 1 public contracting contact. Use the solicitation's stated communication rules and deadlines before contacting the buyer.
Questions to resolve next
What this opportunity record tells you
SAM.gov identifies this as a solicitation from ENERGY, DEPARTMENT OF. The record was posted on November 2, 2026 and currently lists December 18, 2026 as the response deadline. GovBidFit keeps source facts separate from its matching guidance so you can see what comes from the federal notice.
The listed product or service classification is NAICS 237130 · Power and Communication Line and Related Structures Construction · PSC Z2MZ. The set-aside field is No Set aside used. These fields help narrow your search, but they do not replace the full solicitation, amendments, attachments, clauses or eligibility language on the official source.
Before deciding to bid
GovBidFit lets you browse federal contract opportunities for free and create free bid alerts. It displays public SAM.gov notice data stored in its database, with a compact snapshot as a fallback. GovBidFit is independent and is not a U.S. government website. Data can lag amendments or later source changes, so always verify the current notice, attachments and deadline on SAM.gov before bidding.