UT NP ARCH 100(2) Bridges on Delicate Arch Road

Solicitation 6982AF27B000005 · Due 2026-11-19. UT NP ARCH 100(2) Bridges on Delicate Arch Road. TRANSPORTATION, DEPARTMENT OF in Utah · NAICS 237310.

Solicitation6982AF27B000005
Notice typeSolicitation
PostedOctober 22, 2026
Response deadlineNovember 19, 2026
Place of performanceMoab, Utah, 84532, USA
ClassificationNAICS 237310 · Highway, Street, and Bridge Construction · PSC Y1LB
Set-asideNo Set aside used

OFFICIAL NOTICE CONTENT

Opportunity description

Stored from SAM.gov public data

PROJECT NUMBER: UT NP ARCH 100(2) PROJECT NAME: Bridges on Delicate Arch Road PROJECT DESCRIPTION: Delicate Arch Road (DAR) is within Arches National Park (Park) and provides access to Delicate Arch. DAR is a functional class 1 roadway (Principal Park Road) and is heavily traveled by visitors and often congested during periods with moderate-to-high levels of visitation. DAR crosses three low-gradient ephemeral washes (Salt Valley Wash, Salt Wash, and Winter Camp Wash) near their confluence in the Salt Wash Basin downstream of Wolfe Ranch. Culverts installed during original road construction in the mid-1990s and during subsequent upgrades are inadequate to allow unobstructed stream flow and sediment transport downstream. This existing condition produces flooding and sediment deposition, which creates unsafe conditions for visitors, triggers road closures, potentially strands Park visitors, diminishes visitor experience of the Park, and generates high operational costs associated with traffic management, visitor safety, and cleanup operations. SCOPE OF THE WORK: This project will be designated as Reconstruction (4R) with one segment of restoration (3R), and will design and construct 100� span concrete bridges at the Salt Valley Wash, Salt Wash, and Winter Camp Wash. The DA roadway profile at each Wash will be raised to accommodate a 10-year design frequency and allow a medium-sized excavator to access each wash. The DA will be realigned at the Salt Valley wash, moving the roadway and new bridge location to the north of the existing roadway and drainage crossing. The remaining 3R sections of the roadway will receive full depth reclamation (FDR) or removal of pavement, including all parking areas, followed by a 4-inch pavement overlay. PRINCIPAL WORK ITEMS: 20420-0000 Embankment Construction: 10,000 CUYD 25101-0300 Placed Riprap, Class 3: 1,725 CUYD 30202-2000 Roadway Aggregate, Method 2: 5,140 TON 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, 1/2-Inch or 3/4-Inch Nominal Maximum Size Aggregate, 0.3 To <3 Million ESAL: 8,300 TON 55201-0200 Structural Concrete, Class A (AE): 752 CUYD 55401-2000 Reinforcing Steel, Epoxy Coated: 138,000 LB 55601-1100 Bridge Railing, Steel, Two Rail: 642 LNFT 56501-0200 Drilled Shaft, 24-Inch Diameter: 750 LNFT 56501-0300 Drilled Shaft, 30-Inch Diameter: 890 LNFT 60901-1300 Curb, Concrete, 15-Inch Depth (Reinforced, Colored): 3,921 LNFT 61701-4500 Guardrail System Mgs, Type 2, Class A Steel Posts: 1,290 LNFT 63506-0500 Temporary Traffic Control, Flagger: 5,800 HOUR ANTICIPATED SCHEDULE: Advertisement � September 2026 Award � November 2026 NTP � December 2026 Contract Completion � December 2028 ESTIMATED COST RANGE: Total estimated cost between $10,000,000 and $20,000,000 This will be solicited as a full and open competition.

FEDERAL BUYER

Buyer and contracting office

View buyer page →
Department / agencyTRANSPORTATION, DEPARTMENT OF
Sub-tierFEDERAL HIGHWAY ADMINISTRATION
Contracting office6982AF CENTRAL FEDERAL LANDS DIVISI
Office addressLAKEWOOD, CO, 80228, USA

Public points of contact

SecondaryRyan Phillipscflcontracts@dot.gov
PrimaryLaura Slautercflcontracts@dot.gov

DOCUMENTS & LINKS

Opportunity documents

Verify on official source
Attachment URLs are not included in the SAM.gov bulk record for this notice.

That does not mean there are no documents. Open the current SAM.gov notice to see the authoritative attachment and amendment list.

View documents on SAM.gov ↗

GovBidFit does not invent or cache guessed attachment links. The official SAM.gov notice remains the controlling document source.

NOTICE TIMELINE

GovBidFit change history

1 stored event

This timeline records when GovBidFit first stored the notice and material field changes detected during scheduled SAM.gov refreshes. It is an audit aid, not a substitute for the official amendment history.

First seen by GovBidFitOctober 23, 2026

GovBidFit first stored this opportunity from the SAM.gov public bulk feed. This does not replace the official posting date shown above.

GOVBIDFIT SCREENING LENS

What deserves attention before you spend bid time

Decision support

These screening signals are generated from the public notice fields stored for this specific opportunity. They are not eligibility findings or predictions; they are prompts for a faster, more disciplined review of the official solicitation.

Active solicitation stage

This record is in a solicitation stage, so submission instructions, evaluation factors, attachments and amendments should be reviewed before a bid/no-bid decision.

Planning window available

The stored response date leaves more than ten days, but amendments and pre-response milestones can shorten the usable preparation window.

Eligibility gate recorded

No Set aside used is recorded as the set-aside or restriction. Confirm the bidding entity actually satisfies the applicable program and size requirements before investing proposal time.

Classification signal

NAICS 237310 · PSC Y1LB is the recorded classification. Use it as a screening clue, then compare the actual scope and deliverables rather than treating the code alone as proof of fit.

Notice history exists

GovBidFit stores 5 notices tied to this solicitation. Review the notice chain and official SAM.gov history because later postings can change dates, scope or instructions.

Official description stored

GovBidFit stores the source notice text, but its length does not prove the requirements are complete. Review official attachments, clauses, amendments and Q&A before relying on the description.

Public buyer contact available

The source data includes 2 public contracting contacts. Use the solicitation's stated communication rules and deadlines before contacting the buyer.

Questions to resolve next

Has SAM.gov posted an amendment or changed the response date, attachments or submission instructions since this GovBidFit snapshot was refreshed?Are there question deadlines, site visits, registrations or internal approvals that occur before the final response date?Does the bidding entity hold the required current status for the recorded set-aside and the solicitation's assigned NAICS size standard?Can the business perform in Utah at a sustainable cost after travel, mobilization, staffing, licensing and subcontractor requirements are considered?Which related notice or amendment currently controls the response instructions?

What this opportunity record tells you

SAM.gov identifies this as a solicitation from TRANSPORTATION, DEPARTMENT OF. The record was posted on October 22, 2026 and currently lists November 19, 2026 as the response deadline. GovBidFit keeps source facts separate from its matching guidance so you can see what comes from the federal notice.

The listed product or service classification is NAICS 237310 · Highway, Street, and Bridge Construction · PSC Y1LB. The set-aside field is No Set aside used. These fields help narrow your search, but they do not replace the full solicitation, amendments, attachments, clauses or eligibility language on the official source.

Before deciding to bid

Read the complete official description and scope. Verify the exact response date, time and time zone on SAM.gov. Confirm NAICS/PSC and every set-aside eligibility requirement. Review attachments, amendments, Q&A and submission instructions. Check place of performance, staffing, insurance, bonding and execution requirements.
Source and trust

GovBidFit lets you browse federal contract opportunities for free and create free bid alerts. It displays public SAM.gov notice data stored in its database, with a compact snapshot as a fallback. GovBidFit is independent and is not a U.S. government website. Data can lag amendments or later source changes, so always verify the current notice, attachments and deadline on SAM.gov before bidding.

Open the official SAM.gov notice →