OFFICIAL NOTICE CONTENT
Opportunity description
Drawing sets and permitted use: The published package includes C27 - Single-Line Schematics.pdf, marked original revision 03/28/2017, and Facility Single Line Diagram.pdf, revision B dated 09/04/2024. Both contain contractor use/reproduction notices. Please confirm whether these published PDFs may be shared with prospective subcontractors for quotation preparation and whether any handling restrictions apply. Which set controls where they differ? In particular, the older set excludes the Building 1D TN branch, while the newer set shows TN-LBSW; please confirm its current testing scope. They are allowed to be shared to subcontractors. TN-LBSW is to be included. Existing source files and reports: Are native CAD drawings, the previous triennial test report with equipment lists/results, and the existing coordination/arc-flash study and native model files (SKM, ETAP, or EasyPower) available? If so, please advise how bidders may obtain them and any permitted-use restrictions. We understand that updated PDF/CAD drawings and study deliverables are required, but have not confirmed what existing source files VA will furnish. See attached drawings/report. Switching and staffing: Who is responsible for medium-voltage switching, isolation, lockout/tagout, and restoration during the Saturday outage? Will a VA electrician be assigned to each shift, and what support or equipment, if any, will VA provide? VA personal will be there to attend the Saturday outage. All equipment needed for testing is to be supplied by the contractor. VA electricians will be assigned to each shift.� Facility and equipment scope: Please provide the complete list of facilities added since 2017 and the associated equipment to be included, with building/equipment identifiers mapped to the drawings. The SOW's Day 12 plus TBD entry mentions the parking structure but does not provide an exhaustive list. The new parking garage. Please see attached for diagram. Badging and background checks: The solicitation incorporates FAR 52.204-9 and VAAR 852.204-70/852.204-72. Please confirm the Reno-specific credentialing and background-check requirements, applicable position/risk designation, required forms and sponsor/contact, expected processing lead time, and whether any interim or escorted access is permitted. Contractors are to check in with the police at the start of each shift for badges.
FEDERAL BUYER
Buyer and contracting office
Public points of contact
DOCUMENTS & LINKS
Opportunity documents
That does not mean there are no documents. Open the current SAM.gov notice to see the authoritative attachment and amendment list.
GovBidFit does not invent or cache guessed attachment links. The official SAM.gov notice remains the controlling document source.
NOTICE TIMELINE
GovBidFit change history
This timeline records when GovBidFit first stored the notice and material field changes detected during scheduled SAM.gov refreshes. It is an audit aid, not a substitute for the official amendment history.
GovBidFit first stored this opportunity from the SAM.gov public bulk feed. This does not replace the official posting date shown above.
GOVBIDFIT SCREENING LENS
What deserves attention before you spend bid time
These screening signals are generated from the public notice fields stored for this specific opportunity. They are not eligibility findings or predictions; they are prompts for a faster, more disciplined review of the official solicitation.
This record is in a solicitation stage, so submission instructions, evaluation factors, attachments and amendments should be reviewed before a bid/no-bid decision.
The stored response date leaves more than ten days, but amendments and pre-response milestones can shorten the usable preparation window.
The current feed does not show a program-specific set-aside restriction. That does not remove other eligibility, responsibility, registration or solicitation-specific requirements.
NAICS 238210 · PSC J061 is the recorded classification. Use it as a screening clue, then compare the actual scope and deliverables rather than treating the code alone as proof of fit.
GovBidFit stores 12 notices tied to this solicitation. Review the notice chain and official SAM.gov history because later postings can change dates, scope or instructions.
GovBidFit stores the source notice text, but its length does not prove the requirements are complete. Review official attachments, clauses, amendments and Q&A before relying on the description.
The source data includes 1 public contracting contact. Use the solicitation's stated communication rules and deadlines before contacting the buyer.
Questions to resolve next
What this opportunity record tells you
SAM.gov identifies this as a solicitation from VETERANS AFFAIRS, DEPARTMENT OF. The record was posted on November 2, 2026 and currently lists November 20, 2026 as the response deadline. GovBidFit keeps source facts separate from its matching guidance so you can see what comes from the federal notice.
The listed product or service classification is NAICS 238210 · Electrical Contractors and Other Wiring Installation Contractors · PSC J061. The set-aside field is Unrestricted. These fields help narrow your search, but they do not replace the full solicitation, amendments, attachments, clauses or eligibility language on the official source.
Before deciding to bid
GovBidFit lets you browse federal contract opportunities for free and create free bid alerts. It displays public SAM.gov notice data stored in its database, with a compact snapshot as a fallback. GovBidFit is independent and is not a U.S. government website. Data can lag amendments or later source changes, so always verify the current notice, attachments and deadline on SAM.gov before bidding.
Open the official SAM.gov notice →