OFFICIAL NOTICE CONTENT
Opportunity description
REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE: This is a request for information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a solicitation or a request for proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm�s ability to submit a proposal should formal solicitation be issued in the future. NAICS CODE: 238210 Electrical Contractors and Other Wiring Installation Contractors SMALL BUSINESS STANDARD: $19,000,000.00 NOTE: While Other Transaction Authority is not subject to FAR based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base. PROGRAM/PROJECT OVERVIEW: The 11th Contracting Squadron (11 CONS), District of Washington, has a requirement to execute the design-build upgrades, repairs, and/or replacements to the deteriorated Electrical Switching Stations located at B18 and B168 on Joint Base Anacostia Bolling (JBAB) that includes developing a solution to establish a connection by high voltage electrical redundancy cable. The Government is evaluating the feasibility of executing these requirements via Progressive Design-Build (PDB) utilizing an Other Transaction (OT) Agreement under the statutory authority of 10 U.S.C. � 2808a. This project summary establishes the operational requirements, technical baseline, and acquisition framework for the Progressive Design-Build (PDB) Other Transaction Authority (OTA) effort to modernize Joint Base Anacostia-Bolling�s (JBAB) primary electrical infrastructure. Project Title JBAB Electrical Switching Stations (ESS B18 & B168) Modernization & Grid Redundancy Location Joint Base Anacostia-Bolling (JBAB), 11th Wing Acquisition Strategy Progressive Design-Build (PDB) via Other Transaction Authority (OTA) Primary Objective Engineer comprehensive design packages to repair, upgrade, and interconnect deteriorated electrical switching infrastructure Primary Deliverables 100% executable design packages, specifications, and implementation schedules for ESS upgrades, facility hardening, cable routing, and smart-grid wireless SCADA/telemetry Scope Breakdown by Facility & Component ESS B18 (Switching Station Upgrade) � Full replacement of legacy switchgear with FR3 fluid, air-insulated switchgear (per latest UFC 3-550-01) � Life-cycle cost and sustainability integration (UFC 1-200-02) � Thermal partition separating switchgear room from power generation bay � Dedicated HVAC system and air conditioning ductwork � Sized space heating units � High-efficiency interior LED lighting ESS B168 (Repair, Upgrade & Hardening) � Complete switchgear replacement mirroring ESS B168b using FR3 air-insulated switchgear (UFC 3-550-01) � Sustainable design practices (UFC 1-200-02) � Dedicated single HVAC unit and duct system � Interior/exterior high-efficiency LED flood/task lighting � Raised roof profile with comprehensive crack sealing/insulation � Foundation pillar repairs, crawl space waterproofing, and rainwater gutter system � Motorized roll-up door, cyber/physical cypher-locked access doors, and motorized loading dock ramp with widened sidewalk High-Voltage Redundancy Cables � Design 4-circuit bidirectional interconnect (8 cables total) connecting ESS B18 and ESS B168 � Baseline routing derived from 2025 Engineering Study � Mandatory underground routing preference across base footprint � Aerial routing permitted strictly as secondary exception where subsurface obstructions prevent underground installation Wireless SCADA & Grid Telemetry � Air Force long-term smart-grid wireless connectivity architecture � Cell-enabled control panels reporting directly to electric shop web interface without physical comm trunk lines � Relay-to-control panel comm wiring for ESS B18 and ESS B168 � Additional telemetry control panel integrated into ESS B4505 (sub-station to B18) to monitor sub-station power load profiles Key Technical Standards & Compliance Baseline UFC 3-550-01 Exterior Electrical Power Distribution Mandates modern FR3 biodegradable, fire-resistant fluid dielectric air-insulated switchgears, significantly mitigating environmental and thermal hazards. UFC 1-200-02 High Performance and Sustainable Building Requirements Governs energy efficiency, life-cycle cost effectiveness, indoor environmental quality, and durable materials integration. PDB / OTA Authority Prototype / Collaboration Framework Fosters early contractor involvement during Phase 1 design, mitigating unforeseen site and subsurface risk prior to Phase 2 construction commitment. INFORMATION REQUESTED: Interested industry partners are requested to respond to the following questions to help shape the final acquisition strategy: Company Profile: Q1. Business Name Q2. Address Q3. Point of Contract (Name, Title) Q4. Phone Number Q5. Email Address Q6. Unique Entity ID Q7. Cage Code Q8. Socioeconomic Status (Other Than Small, Small, 8(a), SDVOSB, etc.) Q9. Participating Role (Prime Contractor, Subcontractor, Design Firm, Other) Other Transaction Authority (OTA) & Statutory Compliance: Q10. OTA Experience � Describe your firm�s previous experience, if any, executing projects utilizing OTA. Q11. What project characteristics make PDB OTA particularly advantageous or disadvantageous for this requirement? Progressive Design-Build (PDB) / Early Contractor Involvement: Q12. What minimum level of detail (e.g., Statement of Need, conceptual site plans, target budget) does your firm require prior to entering Phase 1 (Design/Pre-construction) to feel confident in the project's viability? Q13. What collaborative mechanisms (such as joint design charrettes, target-value design workshops, or phased scoping approvals) do you recommend the Government implement in the first 30-90 days to rapidly transition from a "blank page" to a mutually agreed-upon baseline? Q14. Describe your experience executing Progressive Design-Build, Construction Manager at Risk (CMAR), or other highly collaborative delivery methods where designer and builder worked collaboratively with the owner before locking in a Guaranteed Maximum Price (GMP). Feedback on the Acquisition Strategy & Alternatives: Q15. Does the proposed PDB-OTA strategy incentivize your firm to participate? Why or why not? Q16. Are there alternative acquisition strategies, commercial phasing arrangements, or risk-sharing terms that the Government has not considered that would yield a higher quality facility, faster delivery, or lower cost? Bonding Capability: Q17. Specify your maximum bonding (single and aggregate) as a sole prime contractor and/or as a joint venture. SUBMISSION INSTRUCTIONS: Please submit your responses by 30 November 2026 at 1000 Eastern Standard Time (EST) to Mr. Terry Agena at terry.agena.1@us.af.mil and MSgt Quortez Dorsey quortez.dorsey@us.af.mil. The Government welcomes candid industry feedback and recommendations regarding commercial practices, agreement terms, project phasing, risk sharing, governance, pricing approaches, and other considerations that could improve successful execution of these projects under 10 U.S.C. � 2808a. Interested firms are encouraged to add themselves to the Interested Vendors List associated with this announcement on SAM.gov to receive future updates. Note: Do not submit proprietary trade secrets, protected technologies, or classified information in your response. All feedback received will be handled as public market research to shape the Government's final acquisition approach.
FEDERAL BUYER
Buyer and contracting office
Public points of contact
DOCUMENTS & LINKS
Opportunity documents
That does not mean there are no documents. Open the current SAM.gov notice to see the authoritative attachment and amendment list.
GovBidFit does not invent or cache guessed attachment links. The official SAM.gov notice remains the controlling document source.
NOTICE TIMELINE
GovBidFit change history
This timeline records when GovBidFit first stored the notice and material field changes detected during scheduled SAM.gov refreshes. It is an audit aid, not a substitute for the official amendment history.
GovBidFit first stored this opportunity from the SAM.gov public bulk feed. This does not replace the official posting date shown above.
GOVBIDFIT SCREENING LENS
What deserves attention before you spend bid time
These screening signals are generated from the public notice fields stored for this specific opportunity. They are not eligibility findings or predictions; they are prompts for a faster, more disciplined review of the official solicitation.
This notice appears to be market research rather than a conventional bid invitation. A capability response, technical feedback or evidence of market interest may matter more than a price proposal at this stage.
The stored response date leaves more than ten days, but amendments and pre-response milestones can shorten the usable preparation window.
No Set aside used is recorded as the set-aside or restriction. Confirm the bidding entity actually satisfies the applicable program and size requirements before investing proposal time.
NAICS 238210 · PSC Z2JZ is the recorded classification. Use it as a screening clue, then compare the actual scope and deliverables rather than treating the code alone as proof of fit.
GovBidFit stores the source notice text, but its length does not prove the requirements are complete. Review official attachments, clauses, amendments and Q&A before relying on the description.
The source data includes 2 public contracting contacts. Use the solicitation's stated communication rules and deadlines before contacting the buyer.
Questions to resolve next
What this opportunity record tells you
SAM.gov identifies this as a sources sought from DEPT OF DEFENSE. The record was posted on October 23, 2026 and currently lists November 30, 2026 as the response deadline. GovBidFit keeps source facts separate from its matching guidance so you can see what comes from the federal notice.
The listed product or service classification is NAICS 238210 · Electrical Contractors and Other Wiring Installation Contractors · PSC Z2JZ. The set-aside field is No Set aside used. These fields help narrow your search, but they do not replace the full solicitation, amendments, attachments, clauses or eligibility language on the official source.
Before deciding to bid
GovBidFit lets you browse federal contract opportunities for free and create free bid alerts. It displays public SAM.gov notice data stored in its database, with a compact snapshot as a fallback. GovBidFit is independent and is not a U.S. government website. Data can lag amendments or later source changes, so always verify the current notice, attachments and deadline on SAM.gov before bidding.
Open the official SAM.gov notice →